Sunday, December 7, 2014

What is SEI? CMM? ISO? IEEE? ANSI?

· SEI = ‘Software Engineering Institute’ at Carnegie-Mellon University; initiated by the U.S. Defense Department to help improve software development processes.
· CMM = ‘Capability Maturity Model’, developed by the SEI. It’s a model of 5 levels of organizational ‘maturity’ that determine effectiveness in delivering quality software. It is geared to large organizations such as large U.S. Defense Department contractors. However, many of the QA processes involved are appropriate to any organization, and if reasonably applied can be helpful. Organizations can receive CMM ratings by undergoing assessments by qualified auditors.
Level 1 - characterized by chaos, periodic panics, and heroic efforts required by individuals to successfully complete projects. Few if any processes in place; successes may not be repeatable.
Level 2 – software project tracking, requirements management, realistic planning, and configuration management processes are in place; successful practices can be repeated.
Level 3 – standard software development and maintenance processes are integrated throughout an organization; a Software Engineering Process Group is in place to oversee software processes, and training programs are used to ensure understanding and compliance.
Level 4 – metrics are used to track productivity, processes, and products. Project performance is predictable, and quality is consistently high.
Level 5 – the focus is on continuous process improvement. The impact of new processes and technologies can be predicted and effectively implemented when required.

· ISO 

= ‘International Organization for Standards’ – The ISO 9001, 9002, and 9003 standards concern quality systems that are assessed by outside auditors, and they apply to many kinds of production and manufacturing organizations, not just software. The most comprehensive is 9001, and this is the one most often used by software development organizations. It covers documentation, design, development, production, testing, installation, servicing, and other processes. ISO 9000-3 (not the same as 9003) is a guideline for applying ISO 9001 to software development organizations. The U.S. version of the ISO 9000 series standards is exactly the same as the international version, and is called the ANSI/ASQ Q9000 series. The U.S. version can be purchased directly from the ASQ (American Society for Quality) or the ANSI organizations. To be ISO 9001 certified, a third-party auditor assesses an organization, and certification is typically good for about 3 years, after which a complete reassessment is required. Note that ISO 9000 certification does not necessarily indicate quality products – it indicates only that documented processes are followed.

· IEEE = ‘Institute of Electrical and Electronics Engineers’ – among other things, creates standards such as ‘IEEE Standard for Software Test Documentation’ (IEEE/ANSI Standard 829), ‘IEEE Standard of Software Unit Testing (IEEE/ANSI Standard 1008), ‘IEEE Standard for Software Quality Assurance Plans’ (IEEE/ANSI Standard 730), and others.
· ANSI = ‘American National Standards Institute’, the primary industrial standards body in the U.S.; publishes some software-related standards in conjunction with the IEEE and ASQ (American Society for Quality).

Wednesday, December 3, 2014

What is Capability Maturity Model Integration? (CMMI)

What is Capability Maturity Model Integration? (CMMI)

Capability Maturity Model Integration (CMMI) is a process improvement approach that provides organizations with the essential elements of effective processes.
CMMI for Development Ver 1.2 consists of 22 process areas with Capability or Maturity levels. CMMI should be adapted to each individual company, therefore companies are not "certified." A company is appraised at a certain level of CMMI.

History

The CMMI is the successor of CMM. The goal of the CMMI project is to improve usability of maturity models for software engineering and other disciplines, by integrating many different models into one framework. It was created by members of industry, government and the SEI.

Appraisal

There are three different types of appraisals, type A, B and C. In Appraisal Requirements for CMMI (ARC) the requirements for CMMI appraisal methods are described. The Standard CMMI Assessment Method for Process Improvement (SCAMPI) is the only appraisal method which meets all of the ARC requirements for a Class A appraisal method. The results of the appraisal can be published on the SEI website.

Evaluation

The SEI states that 25 organizations measured increases of performances in the categories cost, schedule, productivity, quality and customer satisfaction. The median increase in performance varied between 14% (customer satisfaction) and 62% (productivity). However, the CMMI model mostly deals with what processes should be implemented, and not so much with how they can be implemented. SEI thus also mentions that these results do not guarantee that applying CMMI will increase performance in every organization. A small company with few resources may be less likely to benefit from CMMI.
Interestingly, Turner & Jain (2002) argue that although it is obvious there are large differences between CMMI and agile methods, both approaches have much in common. They believe neither way is the 'right' way to develop software, but that there are phases in a project where one of the two is better suited. They suggest one should combine the different fragments of the methods into a new hybrid method. The combination of the project management technique Earned value management (EVM) with CMMI has been described (Solomon, 2002). To conclude with a similar use of CMMI, Extreme Programming (XP), a software engineering method, has been evaluated with CMM/CMMI (Nawrocki et al., 2002). For example, the XP requirements management approach, (which relies on oral communication), was evaluated as not compliant with CMMI.

Structure

The CMMI comes with two different representations - staged and continuous. The staged model, which groups process areas into 5 maturity levels, was also used in the ancestor software development CMM, and is the representation used to achieve a "CMMI Level Rating" from a SCAMPI appraisal. The continuous representation, which was used in the ancestor systems engineering CMM, defines capability levels within each profile. The differences in the representations are solely organizational; the content is equivalent.
The CMMI uses a common structure to describe each of the 25 process areas (PAs). A process area has 1 to 4 goals, and each goal is comprised of practices. Within the 22 PAs these are called specific goals and practices, as they describe activities that are specific to a single PA. There is one additional set of goals and practices that apply in common across all of the PAs; these are called generic goals and practices. Table 1 describes CMMI terminology in more detail. The page numbers refer to the Staged Representation. Common Features are historical artifacts from the software CMM; they do not appear in the CMMI v1.2.

CMMI concept definition list

·         Capability Level
o    These levels belong to the continuous representation, apply to an organization’s process-improvement achievement for each process area. There are six capability levels, numbered 0 through 5. Each capability level corresponds to a generic goal and a set of generic and specific practices.
·         CMMI Model
o    Since the CMMI Framework can generate different models based on the needs of the organization using it, there are multiple CMMI models. Consequently, the phrase “CMMI MODEL” could be any one of many collections of information. The phrase “CMMI models” refers to one, some, or the entire collection of possible models that can be generated from the CMMI Framework.
·         Continuous Representation
o    Uses capability levels to measure process improvement.
·         Discipline Amplification
o    These are model components that provide guidance for interpreting model information for specific disciplines (e.g., systems engineering, or software engineering). Discipline amplifications are added to other model components where necessary. These are easy to locate because they appear on the right side of the page and have a title indicating the discipline that they address (for example, “For Software Engineering”).
·         Generic Goals
o    These are called “generic” because the same goal statement appears in multiple process areas. In the staged representation, each process area has only one generic goal. Achievement of a generic goal in a process area signifies improved control in planning and implementing the processes associated with that process area, thus indicating whether these processes are likely to be effective, repeatable, and lasting. Generic goals are required model components and are used in appraisals to determine whether a process area is satisfied.
·         Generic Practices
o    These provide institutionalization to ensure that the processes associated with the process area will be effective, repeatable, and lasting. Generic practices are categorized by generic goals and common features and are expected components in CMMI models. (Only the generic practice title, statement, and elaborations appear in the process areas.)
·         Generic Practice Elaborations
o    After the specific practices, the generic practice titles and statements appear that apply to the process area. After each generic practice statement, an elaboration may appear in plain text with the heading “Elaboration.” The GPE provides information about how the generic practice should be interpreted for the process area. If there is no elaboration present, the application of the generic practice is obvious without an elaboration.
·         Goal
o    A required CMMI component that can be either a generic goal or a specific goal. When you see the word “goal” in a CMMI model, it always refers to model components.
·         Maturity Level
o    This is a defined evolutionary plateau of process improvement. Each maturity level stabilizes an important part of the organization’s processes. Maturity levels, which belong to the staged representation, apply to an organization’s overall maturity. There are five maturity levels, numbered 1 through 5. Each maturity level comprises a predefined set of process areas.
·         Process Area
o    This is a cluster of related practices in an area that, when performed collectively, satisfy a set of goals considered important for making significant improvement in that area. All CMMI process areas are common to both continuous and staged representations. In the staged representation, process areas are organized by maturity levels.
·         References
o    These are informative model components that direct the user to additional or more detailed information in related process areas. Typical phrases expressing these pointers are “Refer to the Organizational Training process area for more information about identifying training needs and providing the necessary training” or “Refer to the Decision Analysis and Resolution process area for more information about evaluating and selecting among alternatives.”
·         Specific Goals
o    These apply to a process area and address the unique characteristics that describe what must be implemented to satisfy the process area. Specific goals are required model components and are used in appraisals to help determine whether a process area is satisfied.
·         Specific Practice
o    This is an activity that is considered important in achieving the associated specific goal. The specific practices describe the activities expected to result in achievement of the specific goals of a process area. Specific practices are expected model components.
·         Staged Representation
o    This uses maturity levels to measure process improvement.
·         Statement
o    This is designed to be used for process-improvement and appraisal purposes.
·         Subpractice
o    These are detailed descriptions that provide guidance for interpreting specific or generic practices. Subpractices may be worded as if prescriptive, but are actually an informative component in CMMI models meant only to provide ideas that may be useful for process improvement.
·         Work Product
o    The term is used throughout the CMMI Product Suite to mean any artifact produced by a process. These artifacts can include files, documents, parts of the product, services, processes, specifications, and invoices. Examples of processes to be considered as work products include a manufacturing process, a training process, and a disposal process for the product. A key distinction between a Work Product and a product component is that a work product need not be engineered or part of the end product.





What is the Capability Maturity Model? (CMM)

Capability Maturity Model (CMM) broadly refers to a process improvement approach that is based on a process model. CMM also refers specifically to the first such model, developed by the Software Engineering Institute (SEI) in the mid-1980s, as well as the family of process models that followed. A process model is a structured collection of practices that describe the characteristics of effective processes; the practices included are those proven by experience to be effective.

CMM can be used to assess an organization against a scale of five process maturity levels. Each level ranks the organization according to its standardization of processes in the subject area being assessed. The subject areas can be as diverse as software engineering, systems engineering, project management, risk management, system acquisition, information technology (IT) services and personnel management.

CMM was developed by the SEI at Carnegie Mellon University in Pittsburgh. It has been used extensively for avionics software and government projects, in North America, Europe, Asia, Australia, South America, and Africa.Currently, some government departments require software development contract organization to achieve and operate at a level 3 standard.

History
The Capability Maturity Model was initially funded by military research. The United States Air Force funded a study at the Carnegie-Mellon Software Engineering Institute to create a model (abstract) for the military to use as an objective evaluation of software subcontractors. The result was the Capability Maturity Model, published as Managing the Software Process in 1989. The CMM is no longer supported by the SEI and has been superseded by the more comprehensive Capability Maturity Model Integration (CMMI).
Maturity Model
The Capability Maturity Model (CMM) is a way to develop and refine an organization's processes. The first CMM was for the purpose of developing and refining software development processes. A maturity model is a structured collection of elements that describe characteristics of effective processes. A maturity model provides:
                       
•          a place to start
•          the benefit of a community’s prior experiences
•          a common language and a shared vision
•          a framework for prioritizing actions
•          a way to define what improvement means for your organization  
                       
A maturity model can be used as a benchmark for assessing different organizations for equivalent comparison. It describes the maturity of the company based upon the project the company is dealing with and the clients.

Context

In the 1970s, technological improvements made computers more widespread, flexible, and inexpensive. Organizations began to adopt more and more computerized information systems and the field of software development grew significantly. This led to an increased demand for developers—and managers—which was satisfied with less experienced professionals.
Unfortunately, the influx of growth caused growing pains; project failure became more commonplace not only because the field of computer science was still in its infancy, but also because projects became more ambitious in scale and complexity. In response, individuals such as Edward Yourdon, Larry Constantine, Gerald Weinberg, Tom DeMarco, and David Parnas published articles and books with research results in an attempt to professionalize the software development process.
Watts Humphrey's Capability Maturity Model (CMM) was described in the book Managing the Software Process (1989). The CMM as conceived by Watts Humphrey was based on the earlier work of Phil Crosby. Active development of the model by the SEI began in 1986.
The CMM was originally intended as a tool to evaluate the ability of government contractors to perform a contracted software project. Though it comes from the area of software development, it can be, has been, and continues to be widely applied as a general model of the maturity of processes in IS/IT (and other) organizations.
The model identifies five levels of process maturity for an organisation. Within each of these maturity levels are KPAs (Key Process Areas) which characterise that level, and for each KPA there are five definitions identified:
                       
•          1. Goals
•          2. Commitment
•          3. Ability
•          4. Measurement
•          5. Verification         
                       
The KPAs are not necessarily unique to CMM, representing - as they do - the stages that organizations must go through on the way to becoming mature.
The assessment is supposed to be led by an authorised lead assessor. One way in which companies are supposed to use the model is first to assess their maturity level and then form a specific plan to get to the next level. Skipping levels is not allowed.

Timeline

                       
 •          1987 SEI-87-TR-24 (SW-CMM questionnaire), released.
•          1989 Managing the Software Process, published.
•          1991 SW-CMM v1.0, released.
•          1993 SW-CMM v1.1, released.
•          1997 SW-CMM revisions halted in support for CMMI.
•          2000 CMMI v1.02, released.
•          2002 CMMI v1.1, released.
•          2006 CMMI v1.2, released.          
                       
Current state
Although these models have proved useful to many organizations, the use of multiple models has been problematic. Further, applying multiple models that are not integrated within and across an organization is costly in terms of training, appraisals, and improvement activities. The CMM Integration project was formed to sort out the problem of using multiple CMMs. The CMMI Product Team's mission was to combine three source models:
1.         The Capability Maturity Model for Software (SW-CMM) v2.0 draft C
2.         The Systems Engineering Capability Model (SECM)
3.         The Integrated Product Development Capability Maturity Model (IPD-CMM) v0.98
4.         Supplier sourcing
CMMI is the designated successor of the three source models. The SEI has released a policy to sunset the Software CMM and previous versions of the CMMI. The same can be said for the SECM and the IPD-CMM; these models were superseded by CMMI.
Future direction
With the release of the CMMI Version 1.2 Product Suite, the existing CMMI has been renamed the CMMI for Development (CMMI-DEV), V1.2. Two other versions are being developed, one for Services, and the other for Acquisitions.
In some cases, CMM can be combined with other methodologies. It is commonly used in conjunction with the ISO 9001 standard, as well as with the computer programming methodologies of Extreme Programming (XP), and Six Sigma.
Levels of the CMM
There are five levels of the CMM:
                       
            •          Level 1 - Initial
o          Processes are usually ad hoc and the organization usually does not provide a stable environment. Success in these organizations depends on the competence and heroics of the people in the organization and not on the use of proven processes. In spite of this ad hoc, chaotic environment, maturity level 1 organizations often produce products and services that work; however, they frequently exceed the budget and schedule of their projects.
o          Organizations are characterized by a tendency to over commit, abandon processes in the time of crisis, and not be able to repeat their past successes again.
o          Software project success depends on having quality people.
•          Level 2 - Repeatable
o          Software development successes are repeatable. The processes may not repeat for all the projects in the organization. The organization may use some basic project management to track cost and schedule.
o          Process discipline helps ensure that existing practices are retained during times of stress. When these practices are in place, projects are performed and managed according to their documented plans.
o          Project status and the delivery of services are visible to management at defined points (for example, at major milestones and at the completion of major tasks).
o          Basic project management processes are established to track cost, schedule, and functionality. The minimum process discipline is in place to repeat earlier successes on projects with similar applications and scope. There is still a significant risk of exceeding cost and time estimate.
•          Level 3 - Defined
o          The organization’s set of standard processes, which is the basis for level 3, is established and improved over time. These standard processes are used to establish consistency across the organization. Projects establish their defined processes by the organization’s set of standard processes according to tailoring guidelines.
o          The organization’s management establishes process objectives based on the organization’s set of standard processes and ensures that these objectives are appropriately addressed.
o          A critical distinction between level 2 and level 3 is the scope of standards, process descriptions, and procedures. At level 2, the standards, process descriptions, and procedures may be quite different in each specific instance of the process (for example, on a particular project). At level 3, the standards, process descriptions, and procedures for a project are tailored from the organization’s set of standard processes to suit a particular project or organizational unit.
•          Level 4 - Managed
o          Using precise measurements, management can effectively control the software development effort. In particular, management can identify ways to adjust and adapt the process to particular projects without measurable losses of quality or deviations from specifications. At this level organization set a quantitative quality goal for both software process and software maintenance.
o          Subprocesses are selected that significantly contribute to overall process performance. These selected subprocesses are controlled using statistical and other quantitative techniques.
o          A critical distinction between maturity level 3 and maturity level 4 is the predictability of process performance. At maturity level 4, the performance of processes is controlled using statistical and other quantitative techniques, and is quantitatively predictable. At maturity level 3, processes are only qualitatively predictable.
•          Level 5 - Optimizing
o          Focusing on continually improving process performance through both incremental and innovative technological improvements. Quantitative process-improvement objectives for the organization are established, continually revised to reflect changing business objectives, and used as criteria in managing process improvement. The effects of deployed process improvements are measured and evaluated against the quantitative process-improvement objectives. Both the defined processes and the organization’s set of standard processes are targets of measurable improvement activities.
o          Process improvements to address common causes of process variation and measurably improve the organization’s processes are identified, evaluated, and deployed.
o          Optimizing processes that are nimble, adaptable and innovative depends on the participation of an empowered workforce aligned with the business values and objectives of the organization. The organization’s ability to rapidly respond to changes and opportunities is enhanced by finding ways to accelerate and share learning.
o          A critical distinction between maturity level 4 and maturity level 5 is the type of process variation addressed. At maturity level 4, processes are concerned with addressing special causes of process variation and providing statistical predictability of the results. Though processes may produce predictable results, the results may be insufficient to achieve the established objectives. At maturity level 5, processes are concerned with addressing common causes of process variation and changing the process (that is, shifting the mean of the process performance) to improve process performance (while maintaining statistical probability) to achieve the established quantitative process-improvement objectives.   
                       
The most beneficial elements of CMM Level 2 and 3:
                       
            •          Creation of Software Specifications, stating what is going to be developed, combined with formal sign off, an executive sponsor and approval mechanism. This is NOT a living document, but additions are placed in a deferred or out of scope section for later incorporation into the next cycle of software development.
•          A Technical Specification, stating how precisely the thing specified in the Software Specifications is to be developed will be used. This is a living document.
•          Peer Review of Code (Code Review) with metrics that allow developers to walk through an implementation, and to suggest improvements or changes. Note - This is problematic because the code has already been developed and a bad design can not be fixed by "tweaking", the Code Review gives complete code a formal approval mechanism.
•          Version Control - a very large number of organizations have no formal revision control mechanism or release mechanism in place.
•          The idea that there is a "right way" to build software, that it is a scientific process involving engineering design and that groups of developers are not there to simply work on the problem du jour.           




What is Capability Maturity Model (CMM)? What are CMM Levels?


Capability Maturity Model is a bench-mark for measuring the maturity of anorganization’s software process. It is a methodology used to develop and refine an organization’s software development process. CMM can be used to assess an organization against a scale of five process maturity levels based on certain Key Process Areas (KPA). It describes the maturity of the company based upon the project the company is dealing with and the clients. Each level ranks the organization according to its standardization of processes in the subject area being assessed.
A maturity model provides:
§  A place to start
§  The benefit of a community’s prior experiences
§  A common language and a shared vision
§  A framework for prioritizing actions
§  A way to define what improvement means for your organization
In CMMI models with a staged representation, there are five maturity levels designated by the numbers 1 through 5 as shown below:
1.    Initial
2.    Managed
3.    Defined
4.    Quantitatively Managed
5.    Optimizing


Maturity levels consist of a predefined set of process areas. The maturity levels are measured by the achievement of the specific and generic goals that apply to each predefined set of process areas. The following sections describe the characteristics of each maturity level in detail.
Maturity Level 1 – Initial: Company has no standard process for software development. Nor does it have a project-tracking system that enables developers to predict costs or finish dates with any accuracy.
In detail we can describe it as given below:
§  At maturity level 1, processes are usually ad hoc and chaotic.
§  The organization usually does not provide a stable environment. Success in these organizations depends on the competence and heroics of the people in the organization and not on the use of proven processes.
§  Maturity level 1 organizations often produce products and services that work but company has no standard process for software development. Nor does it have a project-tracking system that enables developers to predict costs or finish dates with any accuracy.
§  Maturity level 1 organizations are characterized by a tendency to over commit, abandon processes in the time of crisis, and not be able to repeat their past successes.
Maturity Level 2 – Managed: Company has installed basic software management processes and controls. But there is no consistency or coordination among different groups.
In detail we can describe it as given below:
§  At maturity level 2, an organization has achieved all the specific and generic goalsof the maturity level 2 process areas. In other words, the projects of the organization have ensured that requirements are managed and that processes are planned, performed, measured, and controlled.
§  The process discipline reflected by maturity level 2 helps to ensure that existing practices are retained during times of stress. When these practices are in place, projects are performed and managed according to their documented plans.
§  At maturity level 2, requirements, processes, work products, and services are managed. The status of the work products and the delivery of services are visible to management at defined points.
§  Commitments are established among relevant stakeholders and are revised as needed. Work products are reviewed with stakeholders and are controlled.
§  The work products and services satisfy their specified requirements, standards, and objectives.
Maturity Level 3 – Defined: Company has pulled together a standard set of processes and controls for the entire organization so that developers can move between projects more easily and customers can begin to get consistency from different groups.
In detail we can describe it as given below:
§  At maturity level 3, an organization has achieved all the specific and generic goals.
§  At maturity level 3, processes are well characterized and understood, and are described in standards, procedures, tools, and methods.
§  A critical distinction between maturity level 2 and maturity level 3 is the scope of standards, process descriptions, and procedures. At maturity level 2, the standards, process descriptions, and procedures may be quite different in each specific instance of the process (for example, on a particular project). At maturity level 3, the standards, process descriptions, and procedures for a project are tailored from the organization’s set of standard processes to suit a particular project or organizational unit.
§  The organization’s set of standard processes includes the processes addressed at maturity level 2 and maturity level 3. As a result, the processes that are performed across the organization are consistent except for the differences allowed by the tailoring guidelines.
§  Another critical distinction is that at maturity level 3, processes are typically described in more detail and more rigorously than at maturity level 2.
§  At maturity level 3, processes are managed more proactively using an understanding of the interrelationships of the process activities and detailed measures of the process, its work products, and its services.
Maturity Level 4 – Quantitatively Managed: In addition to implementing standard processes, company has installed systems to measure the quality of those processes across all projects.
In detail we can describe it as given below:
§  At maturity level 4, an organization has achieved all the specific goals of the process areas assigned to maturity levels 2, 3, and 4 and the generic goalsassigned to maturity levels 2 and 3.
§  At maturity level 4 Sub-processes are selected that significantly contribute to overall process performance. These selected sub-processes are controlled using statistical and other quantitative techniques.
§  Quantitative objectives for quality and process performance are established and used as criteria in managing processes. Quantitative objectives are based on the needs of the customer, end users, organization, and process implementers. Quality and process performance are understood in statistical terms and are managed throughout the life of the processes.
§  For these processes, detailed measures of process performance are collected and statistically analyzed. Special causes of process variation are identified and, where appropriate, the sources of special causes are corrected to prevent future occurrences.
§  Quality and process performance measures are incorporated into the organizations measurement repository to support fact-based decision making in the future.
§  A critical distinction between maturity level 3 and maturity level 4 is the predictability of process performance. At maturity level 4, the performance of processes is controlled using statistical and other quantitative techniques, and is quantitatively predictable. At maturity level 3, processes are only qualitatively predictable.
Maturity Level 5 – Optimizing: Company has accomplished all of the above and can now begin to see patterns in performance over time, so it can tweak its processes in order to improve productivity and reduce defects in software development across the entire organization.
In detail we can describe it as given below:
§  At maturity level 5, an organization has achieved all the specific goals of the process areas assigned to maturity levels 2, 3, 4, and 5 and the generic goalsassigned to maturity levels 2 and 3.
§  Processes are continually improved based on a quantitative understanding of the common causes of variation inherent in processes.
§  Maturity level 5 focuses on continually improving process performance through both incremental and innovative technological improvements.
§  Quantitative process-improvement objectives for the organization are established, continually revised to reflect changing business objectives, and used as criteria in managing process improvement.
§  The effects of deployed process improvements are measured and evaluated against the quantitative process-improvement objectives. Both the defined processes and the organization’s set of standard processes are targets of measurable improvement activities.
§  Optimizing processes that are agile and innovative depends on the participation of an empowered workforce aligned with the business values and objectives of the organization.
§  The organization’s ability to rapidly respond to changes and opportunities is enhanced by finding ways to accelerate and share learning. Improvement of the processes is inherently part of everybody’s role, resulting in a cycle of continual improvement.

§  A critical distinction between maturity level 4 and maturity level 5 is the type of process variation addressed. At maturity level 4, processes are concerned with addressing special causes of process variation and providing statistical predictability of the results. Though processes may produce predictable results, the results may be insufficient to achieve the established objectives. At maturity level 5, processes are concerned with addressing common causes of process variation and changing the process (that is, shifting the mean of the process performance) to improve process performance (while maintaining statistical predictability) to achieve the established quantitative process-improvement objectives.